
Steps To Going Solar
The Newport Solar Way

Step 1
Getting Started
Grab your coffee, get ready to meet in person or video chat, whatever is convenient for you, and let’s get to know each other.
Once you reach out, a member of our team will:
-
Ask about your energy goals and what’s motivating your interest in solar
-
Review your electric bill to understand your usage patterns
-
Analyze your roof size, shading, pitch, and orientation
We combine these insights to design a tailored solar system proposal that shows your expected energy production, available incentives, and projected payback timeline.
If your home looks like a good fit for solar, we will schedule a site visit that works for you, in person or virtual.
Step 2
Home Site Evaluation
It’s pretty simple. We’ll take a closer look at your home to make sure everything is a good match for solar. We gather the details we need and answer your questions along the way.
One of our solar designers will:
-
Fly a drone at your home to capture detailed roof imagery
-
Collect measurements and evaluate your home in person
-
Identify the optimal placement for your new system
If anything needs adjusting, we’ll walk you through details like adding energy storage or planning for future upgrades.


Step 3
System Design
After your home evaluation, our design team will fine tune your system layout and update your proposal with any new details. This step ensures every aspect of your solar design is accurate and tailored to your home.
-
Confirm measurements, roof details, and shading analysis
-
Adjust equipment selections and pricing if needed
-
Incorporate battery or EV charging options if applicable
-
Update financial details, savings projections, and available incentives
Our systems are designed to perform. Every detail is reviewed carefully to align with your home and your energy goals.
Step 4
Permitting and Preparation
Once you sign off, it’s full speed ahead to installation. We take care of permitting, utility documents, and engineering reviews to finalize your project. We’ll let you know what’s ahead and how to prepare for the next steps.
To prepare:
-
Clear the area around your electrical panel
-
Trim vegetation near your utility meter
-
Have your WiFi password ready
We stay in close contact to ensure everything is ready for install day.


Step 5
Installation Day
This is the big day! You’re on your way to harnessing the power of the sun.
Installation typically takes one or more days, depending on system size and any upgrades. Our in-house crew works from 9 am to 4 pm. We ask that someone be home in the morning to meet the Crew Lead and review the plan. After that, you’re free to go about your day while we take care of the rest.
During installation, the crew will:
-
Prep your roof for secure equipment placement
-
Install wiring, racking, and solar panels
-
Complete the final electrical tie-in
A brief power outage may be needed at the end. Your Crew Lead will let you know when it’s coming so you are never caught off guard.
Step 6
System Activation and Support
Once your system is installed, your panels are in place, and everything looks great, just a few final steps before your home runs on sunshine.
What happens after installation:
-
Inspection: We schedule your town’s final inspection within 1 to 2 weeks
-
Approval: Rhode Island Energy typically issues approval within 1 to 2 weeks
-
Activation: We turn on your system and share simple monitoring setup
Your system includes long-term warranties and ongoing support. We’re always here if you need us.


Start Your Solar Journey
Today
Ready to take the next step? Our team is here to answer your questions, guide you through the process, and design a solar solution that’s right for your home or business. Let’s build a brighter future together.
300 Old Baptist Rd., Unit 2, North Kingstown, RI 02852
(401) 295-4500